| 623 |
5. Impact and dissemination |
2023-11-01 |
2027-11-01 |
Work Package |
Normal |
In Progress |
WPL5
|
| 624 |
5.4. Impact Observatory |
2023-11-01 |
2027-11-01 |
Task |
Normal |
In Progress |
TL5.4
|
| 625 |
5.1. External dissemination and public engagement |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL5.1
|
| 626 |
5.3. Green sustainability |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL5.3
|
| 627 |
5.2. Financial sustainability |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL5.2
|
| 628 |
5.5. Expanding UNITA in Europe and beyond |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL5.5
|
| 629 |
2. Developing UNITA communities |
2023-11-01 |
2027-11-01 |
Work Package |
Normal |
In Progress |
WPL2
|
| 630 |
2.4. Seamless mobility between Campuses and territories |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL2.4
|
| 631 |
2.3. Education, Research and Innovation community |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL2.3
|
| 632 |
2.2. Romance languages learning and intercomprehension |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL2.2
|
| 633 |
2.5. European Citizenship initiative |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL2.5
|
| 634 |
3. UNITA Lifelong Education |
2023-11-01 |
2027-11-01 |
Work Package |
Normal |
In Progress |
WPL3
|
| 635 |
3.2. UNITA Micro-credentials for Lifelong Learning |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL3.2
|
| 636 |
3.1. UNITA personalised international learning paths |
2023-11-01 |
2027-11-01 |
Task |
Normal |
In Progress |
TL3.1
|
| 637 |
3.3. UNITA Innovation in teaching & learning initiative |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL3.3
|
| 638 |
3.4. UNITA Inter-University Digital Campus |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL3.4
|
| 639 |
4. Knowledge-based growth in rural, mountain and cross-border territories |
2023-11-01 |
2027-11-01 |
Work Package |
Normal |
In Progress |
WPL4
|
| 640 |
4.4. UNITA Graduate Schools in alliance focus areas |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL4.4
|
| 641 |
4.1. Inter-territorial interfaces for Innovation |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL4.1
|
| 642 |
4.3. Sharing of infrastructures and Knowledge |
2023-11-01 |
2027-11-01 |
Task |
Normal |
In Progress |
TL4.3
|
| 643 |
4.2. Thematic Research Hubs |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL4.2
|
| 681 |
2.1. Sustainable policies for students and staff |
2023-11-01 |
2027-11-01 |
Task |
Normal |
In Progress |
Delia Virga
|
| 682 |
2.1.1. Outline student and staff policies through-out the alliance |
None |
None |
Activity |
Normal |
Done |
|
| 683 |
2.1.2. Promote student and staff well-being |
None |
None |
Activity |
Normal |
In Progress |
|
| 684 |
2.1.3. Promote inclusion and gender equity |
None |
None |
Activity |
Normal |
In Progress |
|
| 685 |
2.1.4. Foster staff training and career development |
None |
None |
Activity |
Normal |
In Progress |
|
| 686 |
2.1.5. Facilitate organisational innovation through intra-entrepreneurship and management development |
None |
None |
Activity |
Normal |
In Progress |
|
| 687 |
2.1.6. Connect students’ organisations and initiatives |
None |
None |
Activity |
Normal |
In Progress |
|
| 688 |
2.2.1. Chart the activities on Romance languages teaching and learning and IC |
None |
None |
Activity |
Normal |
Done |
|
| 689 |
2.2.2. Define a UNITA label for Romance languages learning and IC |
None |
None |
Activity |
Normal |
Done |
|
| 690 |
2.2.3. Create a network of UNITA language centres, including GEMINAE partners |
None |
None |
Activity |
Normal |
Done |
|
| 691 |
2.2.4. Define and adopt a UNITA Language Policy |
None |
None |
Activity |
Normal |
In Progress |
|
| 692 |
2.2.5. Produce microcredentials/modules with inclusion of “how-to pills” |
None |
None |
Activity |
Normal |
In Progress |
|
| 693 |
2.3.1. Inventory of community building actions in the first phase |
None |
None |
Activity |
Normal |
Done |
|
| 694 |
2.3.2. Implement Task-focused open actions for community building |
None |
None |
Activity |
Normal |
Done |
|
| 695 |
2.3.3. Starting projects implementation |
None |
None |
Activity |
Normal |
To Do |
|
| 696 |
2.3.4. Implement advanced projects |
None |
None |
Activity |
Normal |
To Do |
|
| 697 |
2.3.5. Summarize and draw conclusion on the second phase of UNITA community building actions |
None |
None |
Activity |
Normal |
To Do |
|
| 698 |
2.4.1. Define an alliance mobility strategy and action plan |
None |
None |
Activity |
Normal |
Done |
|
| 699 |
2.4.2. Encourage and facilitate mobility |
None |
None |
Activity |
Normal |
In Progress |
|
| 700 |
2.4.3. Ensure accessible mobility for every student |
None |
None |
Activity |
Normal |
In Progress |
|
| 701 |
2.4.4. Enhance the impact on the territories: UNITA Rural Mobility |
2025-03-03 |
2025-03-31 |
Activity |
Normal |
In Progress |
|
| 702 |
2.4.5. Track careers after mobilities |
None |
None |
Activity |
Normal |
In Progress |
|
| 703 |
2.5.1. Recap UNITA phase one activity on European Citizenship |
None |
None |
Activity |
Normal |
Done |
|
| 704 |
2.5.2. Organize an annual Conference on European Citizenship |
None |
None |
Activity |
Normal |
In Progress |
|
| 705 |
2.5.3. Set up UNITA prizes and contests on European Citizenship |
None |
None |
Activity |
Normal |
In Progress |
|
| 706 |
2.5.4. Develop an action plan to integrate European Citizenship into the curricula of UNITA universities |
None |
None |
Activity |
Normal |
In Progress |
|
| 707 |
2.5.5. Promote a sense of belonging to European communities and inclusiveness |
None |
None |
Activity |
Normal |
In Progress |
|
| 708 |
3.1.1. Introduce the new partners to the achievements and lessons learned from phase one |
None |
None |
Activity |
Normal |
Done |
|
| 709 |
3.1.2. Create the “UNITA à la carte” model |
None |
None |
Activity |
Normal |
In Progress |
|
| 710 |
3.1.3. Introduce the mobility window (MW) in study programmes |
None |
None |
Activity |
Normal |
In Progress |
|
| 711 |
3.1.4. Develop and promote a UNITA label for shared study programmes |
None |
None |
Activity |
Normal |
Done |
|
| 712 |
3.1.5. Design and implement shared UNITA degrees |
None |
None |
Activity |
Normal |
In Progress |
|
| 713 |
3.2.1. Define the UNITA strategy for Lifelong Learning |
None |
None |
Activity |
Normal |
Done |
|
| 714 |
3.2.2. Define and award the UNITA microcredential label |
None |
None |
Activity |
Normal |
In Progress |
|
| 715 |
3.2.3. Develop new microcredentials meeting emerging needs |
None |
None |
Activity |
Normal |
In Progress |
|
| 716 |
3.2.4. Set up the catalogue of UNITA labelled micro-credentials |
None |
None |
Activity |
Normal |
In Progress |
|
| 717 |
3.2.5. Use microcredentials as a contribution to the UNITA financial sustainability |
None |
None |
Activity |
Normal |
In Progress |
|
| 718 |
3.3.1. Include the new partners of the alliance in the existing UNITA Teaching and Learning Centres Network |
None |
None |
Activity |
Normal |
Done |
|
| 719 |
3.3.2. Develop the UNITA teacher training offer |
None |
None |
Activity |
Normal |
Done |
|
| 720 |
3.3.3. Implement and test the UNITA teacher training |
None |
None |
Activity |
Normal |
In Progress |
|
| 721 |
3.3.4. Launch yearly calls on Innovation in Learning & Teaching |
None |
None |
Activity |
Normal |
In Progress |
|
| 722 |
3.3.5. Develop the UNITA communities of practice |
None |
None |
Activity |
Normal |
In Progress |
|
| 723 |
3.4.1. Set up the UNITA inter-university digital campus |
None |
None |
Activity |
Normal |
Done |
|
| 724 |
3.4.2. Set the specifications of the inter-university digital campus |
None |
None |
Activity |
Normal |
Done |
|
| 725 |
3.4.3. Implement and test the UNITA inter-university digital campus in a continuous monitoring and follow-up approach |
2025-03-12 |
2025-04-30 |
Activity |
Normal |
In Progress |
|
| 726 |
4.1.1. Chart the cartography of the smart specialization strategies and ecosystems |
None |
None |
Activity |
Normal |
Done |
|
| 727 |
4.1.2. Enlarge and reinforce the UNITA entrepreneurship network created in the InnoUNITA project |
None |
None |
Activity |
Normal |
In Progress |
|
| 728 |
4.1.3. Build an industry-driven and challenge-based teaching and learning network |
None |
None |
Activity |
Normal |
To Do |
Oriana Bertoia
|
| 729 |
4.1.4. Create a tech transfer offices network |
None |
None |
Activity |
Normal |
In Progress |
|
| 730 |
4.1.5. Enlarge and reinforce the UNITA science dissemination community |
None |
None |
Activity |
Normal |
To Do |
N.A Bianca Tescasiu
|
| 731 |
4.2.1. Evolve and update the researchers cartography |
None |
None |
Activity |
Normal |
Done |
|
| 732 |
4.2.2. Design, implement and deploy the new hubs and reinforce the existing ones |
None |
None |
Activity |
Normal |
In Progress |
|
| 733 |
4.2.3. Develop common principles, rules, and procedures informing UNITA Open Science research policy |
None |
None |
Activity |
Normal |
In Progress |
|
| 734 |
4.2.4. Evolve this common basic organization into more institutionalized international research centres |
None |
None |
Activity |
Normal |
To Do |
|
| 735 |
4.3.1. Complete and update the mapping of partners infrastructures and related services developed by Re-UNITA |
None |
None |
Activity |
Normal |
Done |
|
| 736 |
4.3.2. Consolidate the model for sharing research infrastructures and services, based on a decentralized management and Open Data approaches |
None |
None |
Activity |
Normal |
Done |
|
| 737 |
4.3.3. Launch regular calls to co-finance access to infrastructures |
2025-03-18 |
2025-04-10 |
Activity |
Normal |
In Progress |
|
| 738 |
4.3.4. Assess the necessary system modifications |
None |
None |
Activity |
Normal |
In Progress |
|
| 739 |
4.3.5. Enhance the system by adapting necessary changes and intensifying the sharing of services and infrastructures |
None |
None |
Activity |
Normal |
To Do |
|
| 740 |
4.4.1. Collect and chart current master and doctoral training activities |
None |
None |
Activity |
Normal |
In Progress |
Carole Haritchabalet
|
| 741 |
4.4.2. Define standards for the eligibility of learning programmes for the UGS |
None |
None |
Activity |
Normal |
Done |
|
| 742 |
4.4.3. Progressively implement the UGS in the UNITA focus areas |
None |
None |
Activity |
Normal |
In Progress |
|
| 743 |
5.1.1. Chart current practices of communication and dissemination |
None |
None |
Activity |
Normal |
Done |
|
| 744 |
5.1.2. Create a map of stakeholders |
None |
None |
Activity |
Normal |
Done |
|
| 745 |
5.1.3. Update the UNITA Communication Plan |
None |
None |
Activity |
Normal |
Done |
|
| 747 |
5.2.1. Update the UNITA Sustainability Plan |
None |
None |
Activity |
Normal |
Done |
IOSU GARCIA FERNANDEZ
|
| 748 |
5.2.2. Define the economic model and common financial methodology |
None |
None |
Activity |
Normal |
Done |
N.A Laura Corazza
|
| 749 |
5.2.3. Set up and run the UNITA Project Engine Office |
2025-03-24 |
2025-05-26 |
Activity |
Normal |
In Progress |
IOSU GARCIA FERNANDEZ
|
| 750 |
5.2.4. Implement the UNITA Sustainability Plan and refine the common financial methodology |
2025-04-29 |
2025-05-28 |
Activity |
Normal |
In Progress |
N.A Laura Corazza
|
| 751 |
5.1.4. Implement and test the Communication Plan |
None |
None |
Activity |
Normal |
In Progress |
|
| 752 |
5.1.5. Contribute to increasing the sense of belonging to UNITA of our university communities |
None |
None |
Activity |
Normal |
In Progress |
|
| 753 |
5.3.1. Create the general framework of the green sustainability approach for UNITA actions |
None |
None |
Activity |
Normal |
Done |
|
| 754 |
5.3.2. Design the UNITA Green Sustainability Action Plan |
None |
None |
Activity |
Normal |
Done |
|
| 755 |
5.3.3. Introduce sustainability topics into the students’ curricula |
None |
None |
Activity |
Normal |
In Progress |
|
| 756 |
5.3.4. Promote green mobility |
None |
None |
Activity |
Normal |
In Progress |
|
| 757 |
5.3.5. Create a culture of sustainability |
None |
None |
Activity |
Normal |
In Progress |
|
| 758 |
5.4.1. Identify the methods for impact measurement |
2023-11-01 |
2027-11-01 |
Activity |
Normal |
Done |
|
| 759 |
5.4.2. Design methodology, data collection and interfaces dashboard principles |
2024-02-01 |
2024-10-31 |
Activity |
Normal |
In Progress |
|
| 760 |
5.4.3. Implement and test first series of impact measurement |
2025-01-01 |
2025-04-25 |
Activity |
Normal |
In Progress |
|
| 761 |
5.4.4. Collect and assest feedback from target group and stakeholders |
None |
None |
Activity |
Normal |
To Do |
|
| 762 |
5.4.5. Intensify and widen the impact measurement methodology to all strategies |
None |
None |
Activity |
Normal |
To Do |
|
| 763 |
5.5.1. Introduce the new partners to the UNITA international network |
None |
None |
Activity |
Normal |
Done |
|
| 764 |
5.5.2. Enhance the GEMINAE network |
2024-11-04 |
2025-10-31 |
Activity |
Normal |
In Progress |
|
| 765 |
5.5.3. Participate and organize inter-alliance events |
2024-11-28 |
2025-10-30 |
Activity |
Normal |
In Progress |
|
| 766 |
5.5.4. Collect and assess feedback from target groups and end-users |
None |
None |
Activity |
Normal |
To Do |
|
| 801 |
1. Governance, management and quality |
2023-11-01 |
2027-10-31 |
Work Package |
Normal |
In Progress |
WPL1
|
| 802 |
1.1. Improve and transform the governance of UNITA |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL1.1
|
| 803 |
1.2. Manage and coordinate UNITA |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL1.2
|
| 804 |
1.3. UNITA Quality Assurance |
2023-11-01 |
2027-10-31 |
Task |
Normal |
In Progress |
TL1.3
|
| 805 |
1.1.1. Introduce the new partners to the achievements and lessons learned from phase one |
None |
None |
Activity |
Normal |
Done |
TL1.1
|
| 806 |
1.1.2. Update and maintain the governance structures (Governance Board, Student Assembly, Quality and Evaluation Board) |
None |
None |
Activity |
Normal |
In Progress |
TL1.1
|
| 807 |
1.1.3 Establish the agenda of the new bodies of the enlarged alliance |
None |
None |
Activity |
Normal |
Done |
TL1.1
|
| 808 |
1.1.4. Coordinate the development of the UNITA model for a European University |
None |
None |
Activity |
Normal |
In Progress |
TL1.1
|
| 809 |
1.2.1. Introduce the new partners to the achievements and lessons learned from phase one and to project management practices |
None |
None |
Activity |
Normal |
Done |
TL1.2
|
| 810 |
1.2.2. Establish the UNITA Offices |
None |
None |
Activity |
Normal |
Done |
TL1.2
|
| 811 |
1.2.3. Implement the UNITA management structure |
None |
None |
Activity |
Normal |
Done |
TL1.2
|
| 812 |
1.2.4. Update the UNITA Management Guide and tools and design a DataWarehouse |
None |
None |
Activity |
Normal |
Done |
TL1.2
|
| 813 |
1.2.5. Continuous management and coordination of the tasks activities |
None |
None |
Activity |
Normal |
In Progress |
TL1.2
|
| 814 |
1.3.1. Introduce the new partners to the achievements and lessons learned from phase one and to Quality Assurance practices |
None |
None |
Activity |
Normal |
Done |
TL1.3
|
| 815 |
1.3.2. Update the general synoptic assessment of partner Quality Assurance systems |
None |
None |
Activity |
Normal |
Done |
TL1.3
|
| 816 |
1.3.3. Implement and test the evaluation of progress, processes, cost-efficiency, and deliverables of the first year |
None |
None |
Activity |
Normal |
In Progress |
TL1.3
|
| 817 |
1.3.4. Co-develop together with TT1.1 and disseminate the UNITA Quality Assurance strategy |
None |
None |
Activity |
Normal |
To Do |
TL1.3
|
| 834 |
A.5.5.2.1 Geminae conference Zaragoza |
None |
None |
Action |
Normal |
To Do |
Baldassarri , Sandra Silvia Baldassarri
|
| 835 |
A.5.5.2.2 Best practices awards |
None |
None |
Action |
Normal |
In Progress |
OANA ROXANA IVAN
|
| 836 |
A.5.5.2.4 Define criteria for membership to GEMINAE |
None |
None |
Action |
Normal |
In Progress |
N.A Philippe Bolon
|
| 837 |
A.5.5.2.5 Articulate mobilities of students and staff of the KA 171 obtained in 2024 |
None |
None |
Action |
Normal |
To Do |
Baldassarri , Sandra Silvia Baldassarri
|
| 838 |
A.5.5.2.6 Coordination with TT2.4 for virtual mobility |
None |
None |
Action |
Normal |
In Progress |
N.A Florence Besson-Reynaud
|
| 839 |
A.5.5.2.7 Coordination with TT5.1 for updating the multilingual presentation of GEMINAE network |
None |
None |
Action |
Normal |
In Progress |
N.A Philippe Bolon
|
| 840 |
A.5.5.2.3 Apply for KA171 |
None |
None |
Action |
Normal |
Done |
Yetano Sánchez de Muniaín, Ana Yetano Sánchez de Muniaín
|
| 841 |
URM 2025 CALL |
None |
None |
Action |
Normal |
New |
|
| 842 |
A.5.5.2.8 Evaluate whether the Matching Events on research can be open to GEMINAE Researchers- establish a coordination with T2.3 and WP4 |
None |
None |
Action |
Normal |
Done |
N.A Francisco do Adro
|
| 843 |
A5.5.2.9 Visits to Geminae partners in order to promote UNITA and all its member universities |
None |
None |
Action |
Normal |
New |
Giovanni Andriolo
|
| 844 |
A.5.5.2.10 Geminae network extension |
None |
None |
Action |
Normal |
To Do |
Laurent Dutoit
|
| 845 |
A.5.5.3.1 Participate in conferences oriented towards supporting European Universities Alliances (eg. Compass conference, side-events to the EAIE) |
None |
None |
Action |
Normal |
In Progress |
Simona LACHE
|
| 878 |
D5.2 UNITA financial sustainability plan |
|
|
Deliverable |
Normal |
Done |
TL5.2
|
| 891 |
D1.2 UNITA Management Guide |
|
|
Deliverable |
Normal |
Done |
TL1.2
|
| 893 |
D5.3 UNITA Green Sustainability Report |
|
|
Deliverable |
Normal |
Done |
TL5.3
|
| 894 |
D5.4 UNITA impact observatory plan |
|
|
Deliverable |
Normal |
Done |
TL5.4
|
| 897 |
D5.5 UNITA Expansion in Europe and beyond implemented |
|
|
Deliverable |
Normal |
Done |
TL5.5
|
| 898 |
D1.3 UNITA Quality Assurance plan implemented |
|
|
Deliverable |
Normal |
Done |
TL1.3
|
| 905 |
D4.3 UNITA report on Open Data and shared research infrastructures and services |
|
|
Deliverable |
Normal |
Done |
TL4.3
|
| 906 |
D2.6 UNITA intermediate report on community building in education, research and Innovation |
|
|
Deliverable |
Normal |
To Do |
TL2.3
|
| 907 |
D3.1 UNITA manual on multilingual programmes and micro-credentials |
|
|
Deliverable |
Normal |
To Do |
TL3.1
|
| 908 |
D5.1 UNITA multilingual dissemination plan |
|
|
Deliverable |
Normal |
To Do |
TL5.1
|
| 909 |
D4.4 UNITA Graduate School implemented |
|
|
Deliverable |
Normal |
To Do |
TL4.4
|
| 910 |
D1.1 UNITA model for a European University |
|
|
Deliverable |
Normal |
To Do |
TL1.1
|
| 911 |
D2.1 UNITA student and staff policies’ strategy and action plan implemented |
|
|
Deliverable |
Normal |
To Do |
Delia Virga
|
| 912 |
D2.2 UNITA Language Policy - including an interactive guide for teachers for teaching with IC |
|
|
Deliverable |
Normal |
In Progress |
TL2.2
|
| 913 |
D3.2 UNITA manual on Collaborative teaching methods and innovation in education |
|
|
Deliverable |
Normal |
To Do |
TL3.3
|
| 914 |
D4.2 UNITA thematic research hubs implemented |
|
|
Deliverable |
Normal |
To Do |
TL4.2
|
| 917 |
D2.3 UNITA report on community building in education, research and Innovation |
|
|
Deliverable |
Normal |
To Do |
TL2.3
|
| 919 |
D2.4 UNITA seamless mobility implementation report |
|
|
Deliverable |
Normal |
To Do |
TL2.4
|
| 920 |
D2.5 UNITA European citizenship initiative report |
|
|
Deliverable |
Normal |
To Do |
TL2.5
|
| 921 |
D3.3 UNITA inter-university digital campus implemented |
|
|
Deliverable |
Normal |
To Do |
TL3.4
|
| 922 |
D4.1 UNITA inter-territorial interfaces for innovation reference guide |
|
|
Deliverable |
Normal |
To Do |
TL4.1
|
| 923 |
MS25 UNITA Partnership Agreement |
|
|
Milestone |
Normal |
Done |
Maurizio De Tullio
|
| 924 |
MS13 UNITA Management Guide updated and Datawarehouse model developed |
|
|
Milestone |
Normal |
Done |
TL1.2
|
| 925 |
MS19 UNITA teacher training offer online |
|
|
Milestone |
Normal |
Done |
TL3.3
|
| 926 |
MS07 Map of stakeholders published on the website |
|
|
Milestone |
Normal |
Done |
TL5.1
|
| 927 |
MS09 The UNITA Green Sustainability Action Plan designed |
|
|
Milestone |
Normal |
Done |
TL5.3
|
| 928 |
MS12 UNITA and EEIG bodies established |
|
|
Milestone |
Normal |
Done |
Maurizio De Tullio
|
| 929 |
MS16 Alliance mobility strategy and action plan defined |
|
|
Milestone |
Normal |
Done |
TL2.4
|
| 930 |
MS21 Cartography of the smart specialization strategies and ecosystems charted |
|
|
Milestone |
Normal |
Done |
TL4.1
|
| 931 |
MS08 The Project Engine Office implemented |
|
|
Milestone |
Normal |
Done |
TL5.2
|
| 932 |
MS20 Specifications of the Inter-University Digital Campus and of the services accessible through the European Student Card |
|
|
Milestone |
Normal |
Done |
TL3.4
|
| 933 |
MS22 Model for sharing research infrastructures and services |
|
|
Milestone |
Normal |
Done |
TL4.3
|
| 934 |
MS03 UNITA interactive guide for IC teachers set up |
|
|
Milestone |
Normal |
Done |
TL2.2
|
| 935 |
MS10 Creation of the impact dashboard |
|
|
Milestone |
Normal |
Done |
TL5.4
|
| 936 |
MS24 Interalliance event on Geminae program |
|
|
Milestone |
Normal |
To Do |
TL5.5
|
| 937 |
MS04 UNITA à la carte model implemented |
|
|
Milestone |
Normal |
To Do |
TL3.1
|
| 938 |
MS17 Action plan to integrate European Citizenship into the curricula of UNITA universities defined |
|
|
Milestone |
Normal |
To Do |
TL2.5
|
| 939 |
MS14 First annual monitoring of the QA Plan implementation |
|
|
Milestone |
Normal |
To Do |
TL1.3
|
| 940 |
MS23 Standards for the eligibility of learning programmes for the UGS defined |
|
|
Milestone |
Normal |
To Do |
TL4.4
|
| 941 |
MS01 External intermediate quality evaluation |
|
|
Milestone |
Normal |
To Do |
TL1.3
|
| 942 |
MS05 First series of UNITA labeled curricula implemented |
|
|
Milestone |
Normal |
To Do |
TL3.1
|
| 943 |
MS15 Starting grants allocated on projects |
|
|
Milestone |
Normal |
To Do |
TL2.3
|
| 944 |
MS18 Catalogue of UNITA labelled micro-credentials online |
|
|
Milestone |
Normal |
To Do |
TL3.2
|
| 945 |
MS02 UNITA leadership, career development and organizational innovation models set up |
|
|
Milestone |
Normal |
To Do |
Delia Virga
|
| 946 |
MS06 Establishment of thematic research hubs |
|
|
Milestone |
Normal |
To Do |
TL4.2
|
| 947 |
MS11 Impact measurement |
|
|
Milestone |
Normal |
To Do |
TL5.4
|
| 965 |
R1.1.1 Delay in the constitution of the boards due to the integration of the new partners |
None |
None |
Risk |
Normal |
Done |
Maurizio De Tullio
|
| 966 |
R1.2.1 The deliverables are not produced on time |
None |
None |
Risk |
Normal |
In Progress |
Maurizio De Tullio
|
| 967 |
R1.3.1 The project's results are not at the European standard level |
None |
None |
Risk |
Normal |
In Progress |
TL1.3
|
| 968 |
R2.2.1 The number of students and staffs exposed to intercomprehension is too low |
None |
None |
Risk |
Normal |
In Progress |
TL2.2
|
| 969 |
R2.3.1 The communities are not sufficiently involved in the construction of the European university |
None |
None |
Risk |
Normal |
In Progress |
TL2.3
|
| 970 |
R2.4.1 The number of mobilities inside the alliance is too low |
None |
None |
Risk |
Normal |
In Progress |
TL2.4
|
| 971 |
R3.1.1 The number of UNITA learning experiences (including microcredentials) allowing the personalisation and internationalisation of learning paths is too low |
None |
None |
Risk |
Normal |
In Progress |
TL3.3
|
| 972 |
R3.3.1 The number of teachers trained is too low |
None |
None |
Risk |
Normal |
In Progress |
TL3.3
|
| 973 |
R3.4.1 The inter-university digital campus (IUDC) is not used by the communities |
None |
None |
Risk |
Normal |
In Progress |
Alin Cretu
|
| 974 |
R4.1.1 The number of territorial stakeholders connected to the R&I activities is too low |
None |
None |
Risk |
Normal |
In Progress |
TL4.1
|
| 975 |
R4.2.1 The researchers do not contribute to the thematic Hubs |
None |
None |
Risk |
Normal |
In Progress |
TL4.2
|
| 976 |
R4.3.1 The shared infrastructures are not used by the research community |
None |
None |
Risk |
Normal |
In Progress |
TL4.3
|
| 977 |
R5.2.1 The financial sustainability of UNITA is sub-optimal |
None |
None |
Risk |
Normal |
In Progress |
unita.geie @gmail.com
|
| 978 |
R5.3.1 The UNITA universities do not have sufficient means to calculate and reduce carbon footprint in the campuses |
None |
None |
Risk |
Normal |
In Progress |
TL5.3
|
| 979 |
R5.4.1 UNITA-induced transformation cannot be fully measured and reflected in the impact observatory |
None |
None |
Risk |
Normal |
In Progress |
TL5.4
|
| 980 |
R5.5.1 The GEMINAE partners do not participate in the initiatives |
None |
None |
Risk |
Normal |
In Progress |
TL5.5
|
| 983 |
Contact persons for UNITA Digital Ecosystem |
None |
None |
Action |
Normal |
New |
João Paulo de Sá Valbom
|
| 984 |
Ticketing system |
None |
None |
Action |
Normal |
New |
Alin Cretu
|
| 985 |
Pipeline of developments |
None |
None |
Action |
Normal |
New |
Alin Cretu
|
| 1444 |
A.5.4.1.1 - Application to the 2024 THE (Times Higher Education) Impact Ranking |
None |
None |
Action |
Normal |
In Progress |
|
| 1445 |
A.5.4.1.2 - Internal Analysis of methodology |
None |
None |
Action |
Normal |
Done |
TL5.4
|
| 1446 |
A.5.4.1.3 - Identification of targeted stakeholder groups |
None |
None |
Action |
Normal |
Done |
TL5.4
|
| 1447 |
A.5.4.1.4 - Collection of task indicators |
None |
None |
Action |
Normal |
Done |
|
| 1449 |
A.5.4.1.5 - Design of a mind map |
None |
None |
Action |
Normal |
Done |
|
| 1450 |
A.5.4.2.1 - Discussion on methods of impact measurements |
None |
None |
Action |
Normal |
Done |
|
| 1451 |
A.5.4.2.2 - Design of a provisional common methodology |
None |
None |
Action |
Normal |
Done |
|
| 1452 |
A.5.4.2.3 - Definition of a process owners and design of a calendar to conduct measurements data collection |
None |
None |
Action |
Normal |
Done |
|
| 1453 |
A.5.4.2.4 - Design an impact monitoring dashboard supporting and leading UNITA strategies decision bodies |
None |
None |
Action |
Normal |
In Progress |
TL5.4
|
| 1462 |
Evaluation |
None |
None |
Action |
Normal |
New |
|
| 1476 |
Monitoring system |
2025-01-01 |
2025-04-25 |
Action |
Normal |
In Progress |
Clement Combier
|
| 1477 |
Datawarehouse Design and Development |
None |
None |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1478 |
Indicators computation |
2025-03-10 |
2025-03-28 |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1479 |
Data collection |
2025-03-31 |
2025-04-25 |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1480 |
Computation pipeline creation |
None |
None |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1481 |
External Data source |
2025-03-31 |
2025-03-31 |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1482 |
Strapi Indicator collection |
2025-03-31 |
2025-04-25 |
Action |
Normal |
To Do |
Antonio De Jesus Menchaca Martinez
|
| 1483 |
Computation analysis |
2025-03-10 |
2025-03-28 |
Action |
Normal |
To Do |
Antonio De Jesus Menchaca Martinez
|
| 1484 |
Mobilities indicators computation |
None |
None |
Action |
Normal |
To Do |
Antonio De Jesus Menchaca Martinez
|
| 1485 |
Data lake aggregation |
None |
None |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1486 |
Data lake aggregation |
None |
None |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1487 |
External data sources listing |
None |
None |
Action |
Normal |
New |
Antonio De Jesus Menchaca Martinez
|
| 1488 |
Mobility entry point |
None |
None |
Action |
Normal |
To Do |
Antonio De Jesus Menchaca Martinez
|
| 1568 |
A5.2.3.1 Define scenarios for de Unita Project Engine Office. |
None |
None |
Action |
Normal |
In Progress |
TL5.2
|
| 1569 |
A 5.2.3.1 Define scenarios for the Unita Project Engine Office |
None |
None |
Action |
Normal |
Done |
IOSU GARCIA FERNANDEZ
|
| 1570 |
Infrastructures grant first call DRAFT |
None |
None |
Action |
Normal |
In Progress |
Clement Bardoux
|
| 1579 |
5.3 - Choose the Green Day 2025 activity |
None |
None |
Activity |
Normal |
To Do |
|
| 1580 |
IM 5.3 Green Day 2025 organization |
|
|
Milestone |
Normal |
New |
|
| 1679 |
Elaborate a template for approval by the task team |
None |
None |
Action |
Normal |
In Progress |
N.A Laura Corazza
|